Saint-Ambroix (18)

The project is located in the Cher department, in the commune of Saint-Ambroix, 25 km from Bourges, France. The farm is expected to be commissioned in early 2024. This wind farm consists of 3 wind turbines of 5 MW each, for a total installed capacity of 15 MW. It will produce more than 32 million […]

Read More… from Saint-Ambroix (18)

Rion 2 (40)

SOLVEO Energies has built photovoltaic shades dedicated to ginseng farming. The roof is equipped with 27,250 solar panels with an energy output of 8.7 MWp. The panels were supplied by the French solar panel manufacturer Voltec Solar. Connected to the Enedis network since April 2020, the site is expected to produce 10.3 million kilowatt hours […]

Read More… from Rion 2 (40)